Download the PDF download-pdf-icon-150x178(1) 

Bolt OLT Installation

This document provides instructions to install and turnup the Tellabs® FlexSym BOLT optical line terminal.

Document Revision

  Revision   Date   Notes
Revision A May 2024 Initial Release of Document
Revision B Nov 2024 GA Version of Document
Revision C July 2026 Updated OLT Turnup procedure
Revision D Oct 2026 Added, "BOLT Fully Redundant Power Daisy-Chaining To the Installation Section.
Revision E Nov 2026 Added OLAN Power Consumption to Site Preparation

Related Documentation

N/A