Rack Installation

Use the following procedures to install the equipment in a 23- or 19-inch equipment rack.


The procedures provided in this section assume all the components to be installed are being ordered from Tellabs®. If any component was not ordered from Tellabs®, refer to the installation instructions included with that component.

Warning

Warning: The equipment in the following procedures shall be installed in a restricted access location from the general public. Only trained personnel shall be allowed access to perform maintenance functions after the equipment is installed and energized.  

The components required for the installation of each shelf are listed in the following table.

Table 1:  1150 MDS5 Required Components 

Shelf Description Qty Req’d
Tellabs 1150 MDS5 19-Inch DC Rectifier Shelf w/Extension Mounting Brackets 1
40 Amp Circuit Breakers (shelf) 2
7.5 Amp GMT Fuses (fan tray) 4
AC Power Cables 2
MDS5 Shelf 1
MDS5 Power Cable 1
MDS5 Digital Ground Cable 1
23-Inch Fan Tray w/Mounting Brackets 2
23-Inch Fan Tray Power and Alarm Cable Assy


 


Table 2: 1150E MDS7 Required Components

Shelf Description Qty Req’d
Tellabs 1150E MDS7 19-Inch DC Rectifier Shelf w/Mounting Brackets 1
40 Amp Circuit Breakers provided, 30 Amp min required (shelf) 2
7.5 Amp GMT Fuses (fan tray) 4
AC Power Cables 2
MDS7 Shelf 1
MDS7 Power Cable 1
MDS7 Digital Ground Cable 1
MDS7 Fan Tray Alarm "Y" Cable 1
19-Inch Fan Tray w/Mounting Brackets 2
19-Inch Fan Tray Power and Alarm Cable Assy 2
Note: If installing the MDS7 with 19-Inch Fan Trays in a 23-Inch Rack, additional mounting bracket extensions are required.