The following table lists the specifications of the Tellabs 1150 (MDS5 and MDS7) shelves.

Description Specification
Tellabs 1150/Tellabs 1150E
MDS5 MDS7
  MDS
Input Power –42.5 to –52 Vdc
Power Draw (Watts) (fully loaded) 1201 1061
Dimensions (H x W x D) 15.75 x 23 x12 in (40 x 58.5 x 30.5 cm) 16 x 19 x 12 in (40.6 x 48.3 x 30.5 cm)
Weight 41.55 lb (18.85 kg) 32.35 lb (14.67 kg)
Humidity 5 to 95% non-condensing
Operating Temperature –40 to 149°F (–40 to 65°C)
Air-Flow Bottom to Top
Switch Unit Capacity (2) ESU11s or (2) ESU2s
I/O Card Capacity 16 14
  Fan Tray
Power Draw (Watts) (fully loaded) 171 128
Dimensions (H x W x D) 1.75 x 23 x12 in (4.5 x 58.5 x 30.5 cm) 1.75 x 19 x 12 in (4.5 x 48.3 x 30.5 cm)
Weight 12.1 lb (5.5 kg) 9.75 lb (4.4 kg)

The following table lists the power draw of each circuit card that can be installed in the Tellabs 1150 (MDS5) and Tellabs 1150E (MDS7) shelves. Refer to the Tellabs 1100 Series Optical LAN Plug-In Card Guide for more detailed specifications of each of the listed cards.

Card Type Power Draw (Watts) Notes
Ethernet Switch Unit (ESU11) 50 Tellabs 1150
Ethernet Switch Unit (ESU2) < 100
Quad-port Optical Interface Unit (QOIU7) 65
Alarm Maintenance Unit (AMU1) 6 Tellabs 1150 (MDS5 only)
Timing Distribution Unit (TDU1) 15

Power Availability 

If the equipment is being installed in a rack, ensure that sufficient DC power is available.

  1. Verify that proper ground connections are available for correct terminal operation.
  2. Verify that breakers and/or fuse positions are available in a locally installed DC Rectifier shelf.

Breakers must be a minimum of 40 amps for Tellabs 1150 (MDS5) and/or Tellabs 1150E (MDS7) shelves. GMT type fuses rated at 7.5 Amps are required for MDS5/MDS7 fan shelves.

Facility Grounding 

Prior to beginning the installation, ensure that the facility grounding system is installed in accordance with EIA/TIA-607 Grounding and Bonding Requirements for Telecommunications in Commercial Buildings, United States Department of Agriculture Rural Utilities Service (RUS) Bulletin 1751F-810, and/or local practices, as applicable.

Installation of Overhead Cable Trays 

If the shelf is being installed in a CO or RT-type environment, ensure that sufficient overhead cable trays are installed to accommodate both fiber and metallic cabling.

  1. Verify that overhead cable trays have been installed for the new equipment bays.
  2. If overhead cable trays are not present, ensure that cable tray installation is required.