ONT180C Installation
Document Revisions
| Revision | Date | Notes |
|---|---|---|
| Revision A | May 27, 2021 | Formal release of document |
| Revision B | Oct 3, 2023 | Updated power supply Specifications |
| Revision C | Jan 15, 2024 | Added Rack Mounting with Univeral ONT DIN Mounting Bracket |
| Revision D | March 2024 | Added MCU to IP/Ethernet Feature |
| Revision E |
June 2024 |
Updated software loads and power output.
|
| Revision F | Jan 2025 | Removed 300W configuration, added installation note on stacking ONTs |
Related Documentation
N/A
Introduction
This guide describes the Tellabs ONT180C optical network terminal (ONT), its features, status indicators, installation.
The ONT180C is part of the Tellabs 100 series of GPON ONTs for passive optical networks (PON). It is a compact desktop unit that can sit on a desk, mounted to any number of surfaces using a wall mount bracket (optional).
When connected to a any optical line terminal (OLT) through a single fiber optic cable, the ONT provides high-performance enterprise features, combined with cost, energy, and space savings, all within the Tellabs exclusive high-security All Secure™ PON.
Intended Audience
This document is intended for technicians responsible for:
- Preparing the installation location
- Unpacking and installing the ONT and any accessories
- Connecting the ONT to power and the PON network
- Connecting services to the ONT
Previous | Next