Loader

Download the PDF 

1150 OLT Installation

Introduction

This document provides instructions to install the Tellabs®1150 Optical Line Terminal (OLT). The 1150 is a self-contained and sealed unit, for mounting in standard 23-in (58.4cm) and 19-in (48.3cm) size racks. This guide describes the 100−220 VAC powering, suggested mounting instructions and turn up and the initialization procedures for the OLT1150. The Tellabs®1150 has only one customer replaceable part, it has a replaceable power module.

Document Revisions

  Revision    Date   Notes
Revision A April 2015 Document describes the initial installation of the Tellabs®1150
Revision B
 
Dec 2015
 
  • Additional instructions about switching loads from software release FP27.1 to FP25.6 before initial turnup of ESU2 card in support of SR29.0.
  • Change to warnings in the erasedb command, reverting ESU2 to factory default settings.

Related Documentation

Refer to the following publications for related information. 

Tellabs Product (System) Document Name and Number
Tellabs 1100 Series Tellabs 1100 Series Optical LAN Managing the PON User’s Guide
Tellabs 1100 Series Optical LAN Craft User Interface Guide
Panorama PON Panorama PON Installation and System Administrator User’s Guide Panorama PON Element Management System Web Client User’s Guide

Contents